References
Many of our clients, who initially needed some form of air conditioning, became our long-term partners who now use our contracted service of unit maintenance and servicing.
Studio 3LHD, URANIA
Due to the uneven air distribution caused by sheet metal ducts, tailor-made textile ducts with positioned microperforations have been proposed. The ducts have a diameter of ø340 mm, a length of 21.5 meters, 2 sets that ensure even distribution of cold air over the entire surface of the room. The installation of textile ducts on one aluminum profile.
The complete assembly of textile ducts was done through our service team in ITS-Consulting, and the project solution was proposed by the company: Eksperterm d.o.o.
Meat Industry - Gavrilović, Petrinja
Tailor made fabric ducts, ø650 mm, 12 meters long, 3 sets and ø650 mm, 6 meters long, 1 set. High precision laser cutting perforations for ideal room air distribution. Installation on two stainless steel cables.
Haix, Mala Subotica
Tailor made fabric ducts; ø750 mm, length of 50 meters, 6 sets with a membrane powered by a servo engine.
Paul Green, Prelog
Tailor made fabric ducts; ø630 mm, length of 40 meters, 5 sets with a membrane powered by a servo engine.
Instrumentaria, Zagreb
Tailor made fabric ducts; ø500 mm, length of 15 meters with a membrane powered by a servo engine.
Pet Centar, Zagreb
Tailor made fabric ducts; ø630 mm, length of 23 meters, 2 sets.
PiK, Zagreb
Air conditioning of the entire new meat processing plant which required several hundred meters long tailor made fabric ducts.
Diners, Zagreb
The cooling of both the server room and the building with chillers from the Frigo series of the cooling capacity 22 kw and 70 kw, chiller Maximo of the cooling capacity 64 kw, and three close control units from the Pegasus series of the cooling capacity 25 kw.
Splitska banka, Zagreb
Zagreb The cooling of the server room; two close control units from the Next series of the cooling capacity 15 kw and 10 kw.